Concrete and fibreglass swimming pools


Fibreglass moulded swimming pools

We have a shape and size for every home.  Moulded fibreglass pools (10 year factory backed warranty).  The modern, quick, no mess way to install a swimming pool. 

Super strong, beautifully finished, each of our moulded fibreglass swimming pool shells are factory made to export standards, using the best materials and the latest technology available.

Advantages of fibreglass moulded swimming pools:- 

  • World trend - our moulded pools are manufactured in Gauteng and also marketed worldwide. They are also South Africa’s most popular choice of swimming pool.

  • Quick installation - your moulded shell will take approximately 10 (ten working days) to install.

  • Strong – our moulded shells are installed to engineer’s specifications, using a steel reinforced concrete ring beam.

  • Easy to clean - just an occasional brush or wipe is needed.

  • Saves on pool chemicals – our moulded shells have a smooth, non-porous surface. There is nowhere for algae to breed or stay.

  • Very low maintenance - no painting and no plastering is required. Our moulded shells keep its beautiful finish for life.

  • Healthy and hygienic - there is no porous plaster therefore the growth of bacteria and infectious germs is retarded resulting in an 80% saving in pool chemicals.

  • Long life - fibreglass pools, yachts and boats have provided reliable service for more than 35 years and still look perfect.

If you are interested in getting a quotation on this product or service, please complete and submit our service request form and we will get in touch with you as soon as possible.

Concrete swimming pools - custom designed and built

MINIMUM SPECIFICATIONS FOR THE CONSTRUCTION OF GUNITE OR HAND-PACKED CONCRETE DOMESTIC POOLS UNDER NORMAL CONDITIONS.

REINFORCING FOR GUNITE POOLS - MINIMUM REINFORCING

1. A single layer of reference 156 or 200 high tensile steel fabric.

2. An additional layer of steel fabric referred to in para 1 for cove which must overlap 1 metre both sides.

3. 4 x Y10 high tensile bars in ring beam spaced 100 mm and to be continuous or 2 x Y10 bars with double reinforcing or steel fabric.

ALTERNATIVE METHOD

R8 rods placed throughout the pool at 200 mm centres tied at each intersection.

Note:
For both methods as stipulated above, it would mean that approximately 2.8
kg steel is to be used per 1 meter square.

REINFORCING FOR HAND PACKED POOLS

1. Approximately 4kg of steel reinforcing bars per one meter square.

2. The steel ring beam to be continuous.

GUNITING

1. The standard mix shall comprise 1 part of Portland cement and 4 parts of course, sharp, well graded river sand. The aggregate shall be clean and free from organic impurities; the maximum size of particles not to exceed 10 mm.

2. Gauge boxes may be used when mixing on site or alternatively ready mixed with a guarantee by the supplier of 4 : 1 mix, or

3. 2 Pockets of Portland cement to 5 level concrete wheelbarrows of gunite sand – aggregate 7 mm.

4. Average thickness of gunite to be 100 mm.

5. The gunite shall be applied at a pressure of not less than 3 bars and the distance of the nozzle from the gunite surface shall be between 900 m and 1200 mm to ensure sufficient compaction of the gunite.

6. The gunite shall be initially applied to the floor of the swimming pool, to cove and sides up to a height of approximately 300 mm from the bottom, until the reinforcement has been covered. The balance of the sides and coves shall then be shot. All rebound shall be swept and discarded. Excessive application of gunite forming lumps or irregularity shall be removed.

7. When necessary, prior to gunite, the soil floor to be compacted.

8. Reinforcing steel/mesh must be raised to ensure coverage on both sides by the concrete mix.

MATERIAL STRENGTH – HAND-PACKED POOLS

1. A mix of double washed river sand, Portland cement on aggregate, the minimum size of which to be 13 mm.

2. Average thickness of the concrete to be 150 mm.

3. The initial concrete to have a strength of 30 m.p.a. at 28 days.

4. If concrete to be mixed on site, a cement mixture is to be used.

5. The concrete to be laid in situ within 3 hours of adding water to the mix.

6. Ring-beam to be 300 mm x 150 mm.

CURING PERIOD-HAND-PACK / GUNITE

During the first five days after the construction of the shell, the shell is to be watered intermittently daily by the owner.

COPING AND PAVING

An expansion joint is only essential if over 1 metre width of paving is laid or if paving adjoins another wall. Such joint to be filled with acceptable expansion joint material. The joint should be filled to the full depth of the coping tile thickness.

MOSAIC OR SIMILAR TILE PAVING

Mosaic or similar tiles to be laid at water line with an approximate width of 150 mm.

PAVING SURROUND

The ground to be thoroughly compacted in layers of 150 mm or necessary piling provided for.

ELECTRICAL

1. A time switch to be fitted.

2. Extra cable to be charged for other than that which is provided for in the contract.

3. Wiring to be done in accordance with local authority and / or Escom regulations.

PUMP/ MOTOR FILTER

Size to be provided as per manufacturer’s instructions.

PIPING AND FITTINGS

All piping to be class 6: when P.V.C. rigid piping is used 50 mm O.D. (outer dimension):or 50 mm I.D. (inner dimension) when Polythene piping is used.

FINAL INTERIOR FINISH

Where marble plaster is used, the final interior finish to be applied by steel trowel to an even finish. The finish not to be less than an average thickness of 6 mm. The marble plaster to consist of an approved mix.

HAND-OVER

On “hand-over”, which must take place in daylight, it is recommended that owners be instructed on how to maintain their pool.

MINIMUM SPECIFICATIONS FOR RENOVATIONS

MARBLE PLASTER FINISH OF POOLS (USED AS A FINISH TO A GUNITE / HAND-PACK CONCRETE POOL)

1. The undermentioned specifications are only applicable to re-marbeliting of existing marble plastered, painted or plastered pools.

i. The surface to be marble plastered,must be clean and free of any foreign material which can be detrimental to the binding process of the marble plaster to the surface to be covered by marble plaster.

ii The surface to be marble plastered, must be chipped to provide a proper binding between the marble plaster and surface to be covered. Each chip mark must be at least 3 mm deep and not further away from each other than 10 cm. If the surface to be covered were painted, fibreglass or epoxy coated, the surface must be suitably prepared to accept a marble plaster finish.

2. After above-mentioned preparations, the marble plaster must be mixed and applied in accordance with suppliers specifications.

i. Marble plaster must be mixed with clean water until a sturdy mixture is obtained. (In the event of rain or cold weather, calcium chloride flakes must be added at a rate of 160 gram / 40 kg bag).

ii. A 6 mm layer of marble plaster must be applied by means of a trowel and smoothed down.

iii. The pool must be filled at the renovator’s request.

MINIMUM SPECIFICATIONS FOR FIBREGLASS LINING AND REPAIRS

Directions for the lining of swimming pools with G.R.P. which apply to the lining of  both new and old concrete pools, as well as old pools finished with marble plaster. 

Both the so called “cosmetic” lining and the lining to re-surface a leaking pool, that 
has only plaster cracks, are both in fact cosmetic;as the liner is not a structural part of the pool shell, and only provides a water barrier which should be installed on pool shells which conform to international pool specifications.

Note:
An orthopthalic resin not to be used as a pool lining, because its lower strength and inferior resistance to water.

Primer / Seal Coat:A first priming layer of a low viscosity resin to be used to give good penetration into concrete or marble plaster and left for at least four (4) hours to gel before further work is done.

PREPARATION:

The pool must be clear and free from dirt, sand or any residue.

Inspect for any defects such as cracks, leaks, crumbling plaster, etc. which must be repaired before application of Primer. Pool must be dry!

When the liner is not carried under the coping stones, then a horizontal groove must be cut as high as possible above the water level to a depth of at least 20 mm, which should be dovetailed-shaped and the liner then secured into this groove.

LINER:

A wax free chemical resistant thixo tropio pre-accelerated resin is preferred (for safety reasons) and not pigmented: pigmentation masks the presence of air bubbles which must be removed – “A” Type chopped strand mat to be used: a mass per unit area of either 300 g/m or 450 g/m, but the heavier mat will give better results.

COSMETIC LININGS

a. Pools in good condition and in stable ground, a single layer of 450 g/m can be used.

b. Pools that require repair work, a minimum of mat to be used in two (2) layers of 300 g/m (i.e. 600 g/m).

RESIN / GLASS RATION:

Must be 3 : 1 by mass i.e. 25 % glass content by mass.

THE LINING OPERATIONS:

The pool surface must be divided into sections each of which can easily be covered with the laminate well within the gel time of the resin batch. The catalyst and content (if resin not pre-accelerated) can be varied to alter gel time at different temperatures. The glass fibre mat must be cut and trimmed to fit the divided sections. Approximately 80 % of the resin should be applied evenly to pool surface, followed by the glass fibre mat which must then be rolled with a metal roller, to ensure consolidation of the laminate and removal of voids.

Additional resin can now be applied to obvious “dry spots”. The liner must be allowed to gel before application of the top coat.

Once walls have been completed, the liner is then applied to the floor, also in sections.Floor to wall joints must be overlaid by a minimum of 100 mm.

TOP COAT RESIN (FLOW COAT):

Must be so catalysed (and accelerated if necessary), to afford reasonable pot life (gel time), at the prevailing temperature and must be stirred thoroughly to ensure uniform distribution of the wax content. Paint brushes or lambswool rollers may be used to apply the flow-coat, which can be pigmented to a white or pale blue colour. Avoid dark colours, they carry the wax bloom. The flow-coat must be allowed to cure fully (approximately 24 hours), before inspection. Any defect areas identified during inspection must be sanded down to remove wax surface, washed with styrene and painted over with the flow-coat.

NOTES:

Construction of the pool liner must not begin when air temperature lower than 15 C, nor if there is possibility of rain before completion of the liner.

The pH value of the water should be maintained at 7 ppm at all times. Chlorine, acid, other pool care additions must always be added in diluted form.